Skip to content
PeppercornONE

How to complete an LPE1 form

LPE18 min read

Completing an LPE1 is less about legal expertise and more about gathering the right documents and answering carefully from them. This guide walks through the process step by step, in the order that tends to work best for a self-managed building.

If you are a volunteer director facing this for the first time, the most reassuring thing to know is this: almost every answer already exists somewhere in your building's paperwork. The task is retrieval and organisation, not invention.

Step 1 — Gather the core documents first

Before touching the form, collect the documents that answer most of it. Working from paper rather than memory prevents the single most common problem: answers that contradict the documents attached alongside them.

  • The current buildings insurance schedule.
  • The last two or three years of service charge accounts.
  • The current year's service charge budget.
  • The reserve (sinking) fund balance or statement.
  • The most recent fire risk assessment and any actions arising.
  • Records of planned or ongoing major works, including Section 20 notices.
  • The lease (or a typical lease for the building).
  • The company's details, recent accounts and filings.

Step 2 — Work through the form section by section

Answer in themed blocks rather than jumping around. Each section draws on a specific document, so grouping the work keeps you in one place at a time.

Service charges

State the current annual budget, how costs are apportioned between the flats (usually fixed by the lease as equal shares or percentages), whether the flat being sold is up to date, and what the reserve fund holds. If a large one-off demand or an increase is anticipated, say so — a buyer needs to know.

Insurance

Confirm that buildings insurance is in force, give the insurer, the sum insured and the renewal date, and attach the schedule. This is one of the quickest sections when the current schedule is to hand.

Major works and Section 20

Describe any works planned or under way, with an estimated cost where one exists, and note any Section 20 consultation. If costs are not yet known, a plain statement to that effect is far better than leaving the question blank.

Ground rent and the company

Give the ground rent, when it falls due and whether any is outstanding, then the company's basic details and filing position. Two parties sometimes answer here if ground rent and service charges are administered separately.

Safety, compliance and disputes

Provide the fire risk assessment and any compliance records, answer the Building Safety Act questions with what is known and attach what is held, and disclose any disputes, complaints or proceedings. Where something does not apply, mark it clearly rather than leaving it ambiguous.

Step 3 — Mark what is not applicable or not known

A blank answer worries a conveyancer; a clear 'not applicable' or 'not known' reassures them. Being explicit about what you cannot answer is more professional, and safer, than guessing. If a figure is unavailable, say why and when it is expected.

Step 4 — Attach the supporting documents

Every figure you give should be backed by the document it came from. Attaching the accounts, budget, insurance schedule and fire risk assessment alongside the answers prevents an entire round of follow-up enquiries, because the conveyancer can verify the numbers themselves.

Step 5 — Have a second person review before issuing

The directors issuing the pack remain responsible for it. A quick review by another director — checking figures against documents and confirming nothing is stale — catches most errors before they reach a solicitor. Keep a record of who confirmed each answer and when.

The faster route

The manual process above works, and understanding it is worthwhile. But most of the effort is document-reading, and that is exactly the part software can take on.

Don't want to work through every document by hand? Upload the records you already hold and let Peppercorn One identify the LPE1 answers for you to review.

Upload your block documents to Peppercorn One and it analyses them, identifies the information each LPE1 question needs, and offers it as a suggested answer with a link to the source page. You review, confirm or correct — retaining full control and a complete audit trail — and reuse the confirmed record next time a flat in the building is sold.

This guide is general information about the process, not legal advice. Where a question turns on the terms of your lease, or on a legal issue you are unsure about, take advice from a suitably qualified professional.

Frequently asked questions

Can I complete an LPE1 myself?
Yes. There is no requirement to use a solicitor or managing agent. Directors of a self-managed building routinely complete the LPE1 themselves, working from the documents they hold.
What is the hardest part of completing an LPE1?
Usually finding the documents, not answering the questions. In a self-managed building the information is often spread across several people and inboxes, so gathering it first makes the rest straightforward.
What if I don't know the answer to a question?
Mark it 'not known' and, if possible, note when the information will be available. A clear statement is better than a guess or a blank.

Peppercorn One provides administrative tools and guidance to assist with the preparation of management information. It does not provide legal advice. Users remain responsible for reviewing and approving all information before it is issued.